Net Power - 138kV Project – EPC

Provided a new 138kV loop tap substation on a Engineer, Procure, Construction (EPC) basis. Work included all site preparation, foundations, below and above grade electrical construction, project and construction management, safety, QA/QC, and all testing and commissioning services to install two 138kV Circuit Switchers and one 138kV GCB for two new line positions.