Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-job-openings domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pro-pack-for-wp-job-openings domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121
Multi-Value Project 3 & 4 192-mile 345/161kV Transmission Line – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

Multi-Value Project 3 & 4 192-mile 345/161kV Transmission Line

PROJECT DETAILS

Client:
MidAmerican Energy Company

Project Location:
Iowa

Service(s) Provided:
Engineer, Procure and Construct (EPC)

Installed 192-miles of double circuit 345/161kV transmission line on self-weathering steel monopoles including removal of existing 161kV in existing ROW. Installed three (3) 345kV Substations on an EPC basis, including O’Brien, Kossuth, and Webster. Included one (1) 345kV Black Hawk Substation Expansion on an EPC basis. Included all environmental, access roads, QA/QC, safety, conductor, OPGW, and static wire. Helicopter aided construction, polymer insulators, large drilled pier (cased and slurry drilled), and full-length anchor bolt foundations. Major outage and return to service constraints were required with provisions for avian protection.