PROJECT DETAILS
Client:
Arizona Public Service Company (APS)
Project Location:
Arizona
Service(s) Provided:
Line Construction
Thirty-eight miles of single circuit 3-bundle 500kV transmission line consisting of 245 steel monopoles & two (2) H-frame structures. Forty-seven miles of access roads through flat lands and mountain terrain. The installation and removal of two (2) material yards for a combined total of 55-acres of material storage. Coordination with APS, Power Engineers (Owner’s rep), Arizona State Land Trust, BLM, ADOT, Arizona Fish & Game, Bureau of Reclamation, Luke Air Force Base, WAPA, Maricopa Co, Buckeye City, Peoria City, as well as multiple private landowners.