Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114
Pleasanton to Three Rivers 69/138kV Transmission Line Project – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

Pleasanton to Three Rivers 69/138kV Transmission Line Project

PROJECT DETAILS

Client:
American Electric Power (AEP)

Project Location:
Texas

Service(s) Provided:
Engineer, Procure and Construct (EPC)

Rebuild of the existing single circuit 69kV H-frame wood pole line Pleasanton-Three Rivers transmission line. Project entailed a 41.2-miles rebuilt to 138kV standards using single steel poles and 795 ACSS Drake conductor, with an OPGW in the shield position. Although it continues to operate at 69kV, the line was designed to 138kV standards. The rebuilt line utilized galvanized steel poles on an existing 100-foot ROW