Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114
Rector to Springville 220kV Infrastructure Replacement Project – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

Rector to Springville 220kV Infrastructure Replacement Project

PROJECT DETAILS

Client:
Southern California Edison

Project Location:
California

Service(s) Provided:
Construct Only

Role:
Prime Contractor

The project was to replace a total of approximately 50-miles of ½” steel static wire with new 7 #7 HS Steel static wire. We removed up to 100 sleeves, removed/replaced 1,000 conductor dampers and replaced all static dampers, and added conductor weights to specific tower locations. The majority of the project was located in an area with no vehicle access, therefore all the work was completed utilizing helicopters.