Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114
EC Source Rebuilds and Upgrades AEP Transmission Lines in Texas – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

EC Source Rebuilds and Upgrades AEP Transmission Lines in Texas

Through a recently formed joint venture named ECSL, Houston-based EC Source and Chicago-headquartered Sargent & Lundy completed construction upgrades on an aging 40.5-mile, 69-kV transmission line south of San Antonio, Texas, in March to help AEP ensure reliability for customers.

Read More