Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114
Utility vehicles at the crossroad of electrification, automation and connectivity – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

Utility vehicles at the crossroad of electrification, automation and connectivity

A little over a year ago, National Grid and AVANGRID announced they were the first utilities in the United States “to incorporate fully electric backhoe loaders in their fleets.”

CASE Construction Equipment built the all-electric backhoe loader by using its 580 diesel-powered version as a foundation. To develop the 580 EV, CASE worked with both utilities, battery experts and my employer, Moog Inc, which designs and manufacturers electric and hydraulic motion control products.