Projects

APS – North Valley 230/500kV Transmission Project - Procurement & Construction

Provide all personnel, supervision, and equipment to build a 500/230kV Transmission Line from the TS9 Substation located south of State Route 74 east of the Agua Fria River to the Pinnacle Peak Station located on the north side of Pinnacle Peak Rd. west of Scottsdale Rd. a total distance of 27 miles.  Construct a double circuit line of 500/230kV with (3) 1780 ACSR 84/19 (Chukar) conductors per phase for 500kV and (1) 2156 ACSR 84/19 (Bluebird) conductor per phase for 230kV, plus two OPGW wires utilizing Tubular Steel Poles.  Install down leads, cushions, cable racks and OPGW defenders.