Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem-elements domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thegem domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6114
Florida Power & Light Maintenance Contract Work – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

Florida Power & Light Maintenance Contract Work

PROJECT DETAILS

Client:
Florida Power & Light (FPL)

Project Location:
Florida

Service(s) Provided:
Line Construction/Maintenance

Miami/Broward Florida Power & Light transmission maintenance contract: Replace, install, and/or remove poles, conductor, and insulators for LiDAR, line hardening, and/or emergency purposes. The voltages on this system are: 69kV, 138kV, 230kV, and 500kV.