Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-job-openings domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pro-pack-for-wp-job-openings domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121
Western Spirit 155-mile 345kV Transmission Line Project – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

Western Spirit 155-mile 345kV Transmission Line Project

PROJECT DETAILS

Client:
Pattern Energy

Project Location:
New Mexico

Service(s) Provided:
Engineer, Procure and Construct (EPC)

Western Spirit consisted of one (1) new, single circuit, 155-mile 345kV transmission line, consisted of 707 primarily monopole and H-frame structures. The new transmission line route originated from Pajarito Substation located in Bernalillo County and ends at Clines Corner Switchyard in Santa Fe County. The primary purpose of the Western Spirit Transmission Project is to increase reliability and provide relief to a congested electrical grid. This project will deliver wind energy (800 MW) from Central New Mexico to New Mexico’s electrical grid.