Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-job-openings domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the pro-pack-for-wp-job-openings domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/ecsourceservices.com/wp-includes/functions.php on line 6121
Fancy Point to Horseshoe 230kV Transmission Line Project – EC Source Services
Scroll Top
1138 N Alma School Rd. Suite 220 Mesa, AZ 85201

Fancy Point to Horseshoe 230kV Transmission Line Project

PROJECT DETAILS

Client:
Entergy

Project Location:
Louisiana

Service(s) Provided:
Engineer, Procure and Construct (EPC)

Relocated 7.8 miles of 230kV transmission line from Fancy Point to Horseshoe, installed 52 new structures, and updated and revised relay settings at Fancy Point, Port Hudson, and Horseshoe station remote ends.